Wenqia Technology / Dongguan · Pearl River Delta
Dongguan enterprise IT project delivery
Software, security systems, equipment rental, and data recovery
Services
Architecture · 3 services · REST · OAuth 2.0
- GET /member/1008620038ms
- POST /points/redeem20152ms
- GET /order/248120031ms
- GET /member/1008620044ms
- GET /order/248120029ms
- POST /points/redeem20161ms
Project Timeline
Scheduled after assessment
Project timing depends on scope, system interfaces, and available resources. Scheduling follows assessment.
- Deliverables
- Source code · API documentation · deployment configuration · operations guide
- Timeline
- Requirements approval → launch · timing assessed per project scope
Service Scope
- Video surveillance: IP cameras, NVR storage, video playback, and search
- Access control and timekeeping: facial recognition, IC card readers, and integrated time clocks
- Structured cabling: backbone and floor links, cable trays, and port labeling
- Server-room systems: UPS power, precision cooling, and environmental monitoring
- Systems integration: unified management, alerting, and remote checks
Networking and Security Equipment
- Network
- 24-Port PoE Switch
- Storage
- NVR · 8 Channels
- Frontend
- 8 Cameras
Rent¥1150/set/monthIndicative rate, excluding tax · 3-month minimum term, billed quarterly · stock and rates reviewed quarterly; a written quotation prevails
- Reported
- →Accepted
- →On site
- →Restored
Response times and fees follow the contract agreed by both parties.
Projects
Browse project scope and delivery details by service. Metrics are shown only when supported by verified project records.
News
Published project and industry content from 2024 to date, newest first.
Data security in Dongguan manufacturing: the backup and recovery gap after mass digitalisation
Dongguan’s 2025 GDP reached RMB 1.276 trillion, with over RMB 2.6 trillion in above-scale industrial output and nearly 10,000 above-scale firms digitised. This public-data report examines where manufacturing data concentrates, how ransomware reaches it, and what a realistic 30/90-day recovery plan looks like.
Read more