ARCHIVE · CASES
Projects
Project Data Review:Measurement note: dates, durations, and metrics in these cases are compiled from project records; scope and acceptance criteria are set out in the written proposal and acceptance documents.
Server data recovery: the first 72 hours after a drive drops
A dropped drive, a degraded RAID or a database that will not start: the first actions decide how much can still be recovered. This guide sets out a 72-hour sequence — stop writes, image every member read-only, reassemble the array, validate the database and migrate back — with the checks and limits we use on factory sites in Dongguan.
Dongguan Zhongtang data recovery: RAID 5 production database rescue
A paper packaging plant in Zhongtang, Dongguan, lost two RAID 5 drives. Read-only imaging and database validation restored shipping data in 36 hours.
Houjie furniture factory ERP database recovery after RAID 1 double-disk failure
A furniture manufacturer in Houjie lost both members of a RAID 1 array within two weeks. Read-only imaging, virtual rebuild and database page validation restored ERP scheduling, inventory and shipping data within 48 hours; missing items were listed separately.
Whole-home CCTV deployment for a house in Tangxia, Dongguan
A whole-home CCTV system for a house in Tangxia, Dongguan: six camera points, NVR storage, and remote viewing from phone or PC (points: 6 · lead time: 2 days · remote access: phone/PC).
Production Management System for a Precision Mold Manufacturer
Work-order dispatch, equipment inspection, and process traceability, integrated with the existing ERP material library.
Industrial Park Perimeter Security Upgrade
86 HD cameras, electronic fencing, and access-control interlocking across a Songshan Lake industrial park.
Office Equipment Rental for a Training School
Six devices including colour printers and projectors for a vocational school in Nancheng, billed per term.
Membership and Inventory Mini Program for a Pharmacy Chain
Membership points and stock synchronisation across 42 stores, with QR-code sign-up and inter-store transfers.
Production Dashboard for an Electronics OEM
Shop-floor dashboard collecting data from six SMT lines and displaying OEE and defect rates in real time.
No matching project records. Adjust the filters.
Summary metrics are not published:Project scope, recovered data volume, timelines, and years of service lack records and measurement methods for review.
Showing 1–9 of 28 records
