Project Record · WQ-2024-045Projects
Production Dashboard for an Electronics OEM
Shop-floor dashboard collecting data from six SMT lines and displaying OEE and defect rates in real time.
- Client
- Electronics contract manufacturing · SMT
- Site
- Huizhou
- Scope
- Data capture on 6 lines / live dashboards
- Lead time
- 12 days
Quick summary
- Site/client: an electronics contract manufacturer’s SMT workshop in Huizhou, six production lines.
- Scope: equipment-state capture, workshop dashboards and line-end terminals, plus exception alerts.
- Lead time: 12 days; key decisions: use existing equipment interfaces instead of adding sensors, and aggregate at the edge to keep latency under three seconds.
- Outcome: output, first-pass yield and downtime reasons visible in real time, with downtime reason required.
- Boundaries: excludes full MES, quality traceability and predictive-maintenance models.
A shop-floor dashboard for the SMT department of an electronics contract manufacturer in Huizhou, collecting equipment data from six lines and displaying OEE and defect rates in real time. (Lines: 6 · Delivery: 12 days · Data latency: < 3 s)
Context
SMT output was counted after shift, so problems surfaced at the next morning's meeting. The supervisor's request was simple: stand at the line head and see today's output, first-pass yield and downtime reasons.
Scope and exclusions
Equipment-state capture on six lines, dashboards and anomaly alerts. Full MES workflow, quality traceability and predictive-maintenance modelling were excluded.
- Included: data interfaces for mounters, reflow ovens and AOI, aggregated per line
- Included: shop-floor screens, line-head terminals and mobile lookup
- Excluded: ERP work-order linkage, SPC analysis, maintenance scheduling
Approach and key decisions
Data comes from the machines' existing interfaces; adding sensors would have meant machine modification, stoppages and warranty disputes. Latency under three seconds was achieved by aggregating at the edge rather than shipping every point to a central database.
- Line-level totals first, machine-level detail later — usable before exhaustive
- Downtime reasons are a required picklist, not free text, otherwise everything trends to "other"
Deliverables and acceptance
Line dashboards, an interface inventory, a downtime-reason dictionary and operating notes. Acceptance ran three consecutive production days, cross-checking dashboards against machine counters.
- Deliverables: dashboard accounts, interface list, metric definitions, operating manual
- Acceptance: output within tolerance of machine counters; latency measured from timestamps
Common questions
Q: Why not add sensors?
A: Adding sensors means machine changes, line stops and warranty disputes. Existing interfaces on mounters, reflow ovens and AOI are used first to minimise disruption.
Q: How is sub-three-second latency achieved?
A: Aggregation happens at the edge by line, not by sending all raw data to a central database; the dashboard only requests the metrics it needs.
Q: Why require a downtime reason instead of free text?
A: Free text turns into “other” and cannot be compared. A required list makes shift and line comparisons meaningful.
FAQ
Frequently asked questions
- 01Why not add sensors?
- AnswerAdding sensors means machine modifications, line stoppages and warranty disputes. Using the existing interfaces on the pick-and-place, reflow and AOI machines avoids disrupting production.
- 02How is the 3-second delay achieved?
- AnswerAggregation happens at the edge per line rather than sending everything to a central database, and the dashboard only pulls the metrics it needs.
- 03Why must downtime reasons be selected rather than typed?
- AnswerFree text eventually becomes "other" and cannot be analysed. Making it a required choice is what allows shifts and lines to be compared.
NEXT · WHAT HAPPENS AFTER
Need an assessment for a similar site?
We map the process, existing systems and interface boundaries first, then quote scope, lead time and exclusions.
