Project Record · WQ-2022-011Projects
Analog-to-IP Surveillance Upgrade at an Existing Factory
Upgraded a 16-channel DVR to network storage with remote viewing.
- Client
- Hardware manufacturing
- Site
- Dongguan (city level)
- Scope
- 16-channel analogue-to-IP CCTV upgrade
- Lead time
- 15 days
Quick summary
- Client: an old hardware factory site in Dongguan.
- Scope: upgrade 16 DVR channels to network storage and remote viewing.
- Lead time: 15 days; outcome: 30-day retention and remote access.
- Boundaries: excludes large-scale new camera points, fire-system linkage and site network upgrades.
Analogue surveillance across an ageing hardware factory site in Dongguan was modernised: sixteen DVR channels were migrated to network storage with remote viewing. (Points upgraded: 16 · Delivery: 15 days · Retention: 30 days)
Common questions
Q: Why not replace everything?
A: Usable cabling and cameras are retained; storage and platform are replaced first to limit downtime and cost.
Q: How is 15 days achieved?
A: Zone-by-zone cutover at night, with the old system taken offline only after the new segment is verified.
Q: Is 30-day retention enough?
A: It follows the site’s evidence needs; storage can be expanded later instead of over-provisioning upfront.
Scope and boundaries
Scope follows the written engagement and acceptance checklist. Excludes physical media repair, third-party system changes and forensic reporting. Recovery figures are by file count, with unrecovered items listed separately.
FAQ
Frequently asked questions
- 01Why not replace everything?
- AnswerUsable cabling and cameras are kept. Storage and the platform are replaced first, which limits downtime and cost.
- 02How is 15 days achievable?
- AnswerZones are switched in batches at night, and the old system is taken offline only after the new blocks are verified.
- 03Is 30 days of retention enough?
- AnswerIt is set against the plant's evidence needs. Storage can be expanded for longer retention without filling it all at once.
NEXT · WHAT HAPPENS AFTER
Need an assessment for a similar site?
We survey site points, cabling and power first, then quote the design, bill of materials and installation boundary.