Project Record · WQ-2024-034Projects
Urban Delivery Dispatch Platform for a Logistics Company
Route planning, driver app, and live tracking for local distribution operations.
- Client
- Third-party logistics · urban delivery
- Site
- Dongguan (city level)
- Scope
- Route planning / driver mini program / in-transit tracking
- Lead time
- 92 days
Quick summary
- Client: a third-party logistics operator in Dongguan with 180 urban-delivery vehicles.
- Scope: route planning, driver mini program, in-transit tracking and a customer query page.
- Lead time: 92 days; key move: codify manual dispatch rules first, then open up automatic routing.
- Outcome: 96.4% on-time delivery against promised windows, with exceptions classified separately.
- Boundaries: excludes full WMS/TMS replacement, freight reconciliation and on-board GPS installation.
An urban-distribution dispatch platform for a third-party logistics company in Dongguan, including route planning, a driver-side mini-program and live in-transit tracking. (Vehicles: 180 · Delivery: 92 days · On-time rate: 96.4%)
Context
Urban delivery for 180 vehicles ran on dispatcher phone calls and route experience; when a customer asked where the truck was, the only answer was another call. The punctuality problem was information flow, not fleet size.
Scope and exclusions
Route planning, a driver mini program, in-transit tracking and a customer lookup page. Warehouse management, freight settlement and GPS hardware procurement were excluded.
- Included: order import, load sequencing, driver acceptance and proof of delivery, live position and ETA
- Included: customer lookup page and exception reporting (delay, rejection)
- Excluded: full WMS/TMS replacement, freight reconciliation, in-vehicle terminal installation
Approach and key decisions
Dispatch did not start with an optimiser. Human experience was first encoded as editable rules — zone, time window, vehicle type, load — and automation widened gradually. The driver app was deliberately minimal: accept, navigate, sign.
- Drivers need not stay online: entries are stored locally and synced later, so a dead zone never means lost data
- ETAs use historical duration on the same route rather than straight-line distance, which matches what customers actually experience
Deliverables and acceptance
Dispatch back office, driver app, customer lookup page and an operations manual. The 96.4% on-time figure counts orders delivered inside the promised window over the measured period after go-live.
- Deliverables: system accounts, routing-rule configuration guide, driver training records
- Acceptance: on-time measured from sign-off time against the promised window; exceptions categorised separately
Common questions
Q: Why codify rules before algorithms?
A: Zone, time window, vehicle type and load are first captured as editable rules the dispatcher can correct. Automatic routing opens up only once the baseline is stable.
Q: What happens on a weak network?
A: The driver app records locally and uploads when connectivity returns; it does not require a permanent connection.
Q: How is 96.4% on-time calculated?
A: By comparing delivery sign-off time with the promised window; exceptions are classified separately rather than counted verbally.
FAQ
Frequently asked questions
- 01Why define rules before talking about algorithms?
- AnswerZones, time windows, vehicle types and load limits are first fixed as editable rules that dispatchers and drivers can correct. Automated routing is opened up only after the rules are stable, so the algorithm does not start out disconnected from the site.
- 02What about weak network coverage on the driver app?
- AnswerContinuous connectivity is not required: the app records locally when the signal drops and uploads when it returns, so "no signal" does not mean "no data".
- 03How is the 96.4% on-time rate calculated?
- AnswerBy comparing sign-off time with the promised time window, with exceptions classified separately. It is not a dispatcher's verbal tally.
NEXT · WHAT HAPPENS AFTER
Need an assessment for a similar site?
We map the process, existing systems and interface boundaries first, then quote scope, lead time and exclusions.
