Project Record · WQ-2022-001Projects
Quality and Traceability System for a Food Processor
Batch inspection and traceability from raw-material intake through production to dispatch.
- Client
- Food processing
- Site
- Dongguan (city level)
- Scope
- Quality inspection and batch traceability system
- Lead time
- 55 days
Quick summary
- Client: a food processing company in Dongguan.
- Scope: end-to-end quality and batch traceability from raw-material intake through production to dispatch.
- Lead time: 55 days; outcome: 120,000+ batches, 100% record completeness under acceptance sampling.
- Boundaries: excludes production-equipment interlocks, LIMS and ERP finance.
A batch inspection and traceability system for a food-processing company in Dongguan, covering the whole chain from raw-material intake through production batches to dispatch. (Batches traced: 120,000+ · Delivery: 55 days · Record completeness: 100%)
Common questions
Q: How is 100% record completeness verified?
A: By sampling batches and checking raw-material, production and dispatch records are all present; it refers to the acceptance sample, not all historical data.
Q: What does 55 days include?
A: Coding rules, batch records, scan-based capture, reporting and training; excludes equipment changes.
Q: How does it relate to ERP?
A: Traceability runs independently, with material master data aligned to ERP; it does not replace finance or purchasing.
Scope and boundaries
Scope follows the written engagement and acceptance checklist. Excludes physical media repair, third-party system changes and forensic reporting. Recovery figures are by file count, with unrecovered items listed separately.
FAQ
Frequently asked questions
- 01How is 100% record completeness accepted?
- AnswerBy batch sampling: raw material, production and dispatch records are complete. It refers to the acceptance sample, not all historical data.
- 02What do the 55 days cover?
- AnswerCoding rules, batch records, scan-based collection, reporting and training. Equipment modification is not included.
- 03How does it relate to ERP?
- AnswerThe traceability system runs independently, and material master data can be aligned with the ERP. It does not replace finance or purchasing modules.
NEXT · WHAT HAPPENS AFTER
Need an assessment for a similar site?
We map the process, existing systems and interface boundaries first, then quote scope, lead time and exclusions.
