CASES · SECURITY
Security and low-voltage case studies
Field records for security and low-voltage work: CCTV, access control, structured cabling and server-room refits. The focus is site conditions, how existing systems were handled, and what was checked point by point at acceptance.
- WQ-2026-0022026-10-15Whole-home CCTV deployment for a house in Tangxia, DongguanA whole-home CCTV system for a house in Tangxia, Dongguan: six camera points, NVR storage, and remote viewing from phone or PC (points: 6 · lead time: 2 days · remote access: phone/PC).
- Security and low-voltage2026-06-22Two Houjie parks hand over this month: four handover documents to check before you move inJuntai Binhai Zhigu (RMB 1.3bn) reports over 90% signed for phase one, and Guangda Houjie Smart Valley phase one is due for handover by end of June. The gap between park-level low-voltage systems and tenant fit-out is where most disputes start.
- Security and low-voltage2026-05-18New material projects break ground in Shatian: three low-voltage decisions to lock in earlyA TPU new-material plant has started construction in Suifengnian Village, Shatian. Network backbone, cabinet rooms and earthing are far cheaper to fix during civil works than after the production lines arrive.
- WQ-2025-0572025-06-01Industrial Park Perimeter Security Upgrade86 HD cameras, electronic fencing, and access-control interlocking across a Songshan Lake industrial park.
- WQ-2024-0472024-11-01Video Surveillance for an Auto Parts Plant200 camera points across three workshops, with a central equipment room and remote management platform.
- WQ-2024-0362024-06-01Low-Voltage Systems Upgrade for a Hotel ChainGuest-room control, access control, networking, and four floors of server-room cabling; acceptance passed at first review.
- WQ-2024-0312024-03-01Campus Security and PA System for a SchoolPerimeter surveillance, access control, and a campus-wide public address system.
- WQ-2023-0262023-11-01Cleanroom Access Control and SurveillanceAccess control and monitoring for a cleanroom production area in an electronics plant.
- WQ-2023-0142023-02-01Clinic Security and Queue ManagementSecurity coverage and a queue-numbering system for an outpatient building.
- WQ-2022-0132022-10-01Warehouse Perimeter and Fire System IntegrationPerimeter intrusion detection linked to the fire alarm system for a logistics warehouse.
- WQ-2022-0112022-06-01Analog-to-IP Surveillance Upgrade at an Existing FactoryUpgraded a 16-channel DVR to network storage with remote viewing.
Similar constraints on your site?
